Programme: Human Resources Development

Planning region: All

Description

This investment shall include the installation of interoperable track-side ETCS equipment on 108 electric locomotives and electric multiple-units, a significant increase vs the current 2 locomotives equipped with such technology. It entails the following steps:
• develop a funding allocation mechanism that takes into account information of the eligible railway undertakings, including the number of train-kilometres in the last 5 years, a 10-year business plan for the running of the equipped units and information regarding the provision of own funding (since beneficiaries are expected to fund 50% of the total cost);
• based on the results of the previous point, a procedure under the Public Procurement Act will be announced for the delivery, installation, commissioning, testing and obtaining of permits and training by the Ministry of Transport. The winning participant will deliver the ETCS equipment and carry out the installation in the selected rolling stock.
Activities
Activity Contracted Amount Reported Amount
Доставка и инсталиране на 108 броя бордово оборудване за ERTMS/ETCS: Доставка и инсталиране на 108 броя бордово оборудване за ERTMS/ETCS 126 000 000.00 0.00

Notes:

Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).