BG-RRP-1.015-1606-C02
Construction of a school STEM environment and high-tech equipped and connected classrooms in PG PO TRANSPORT I TRANSPORTEN MENIDZHMANT.
RRF ==>
Recovery and Resilience Plan
000695114 Ministry of Education and Science
19.09.2024
19.09.2024
31.05.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Stara Zagora (BG344), Kazanlak, Kazanlak