Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 64 523 TREES
Български

Organization

Identification

Data Export Excel HTML XML Print
Name Address
175201304 ELECTRICITY SYSTEM OPERATOR EAD България, гр.София, 1000, бул. "Цар Борис III" №201, Industriestrasse 23, 9601 Arnoldstein

List of projects in which the organization is involved as a beneficiary (2)

List of projects in which the organization is involved as a Partner (2)

List of projects in which the organization is involved as a contractor

Programme Project Name UMIS Number Contracts amount Reported amount
2014BG16M1OP001 Transport and transport infrastructure Technical assistance for preparation of project "Modernization of the Sofia-Pernik-Radomir-Gyueshevo-border with Republic of North Macedonia railway line" BG16M1OP001-1.002-0002-C05 0.00 18 842.00
2014BG16M1OP001 Transport and transport infrastructure Technical assistance for preparation of project "Modernization of railway line Sofia - border with Republic of Serbia" BG16M1OP001-5.001-0018-C03 0.00 2 290.00
2014BG16M1OP001 Transport and transport infrastructure Rehabilitation of Railway line Plovdiv – Burgas, Phase 2 - Stage 1 BG16M1OP001-1.001-0003-C05 0.00 15 836.00
2014BG16M1OP001 Transport and transport infrastructure Modernization of the Sofia - Plovdiv railway line: railway section Elin Pelin - Kostenets - phase 1 BG16M1OP001-1.001-0004-C04 0.00 360.00
2014BG16RFOP002 Innovations and competitiveness Supporting medium-sized enterprises to overcome the economic impact of the COVID-19 pandemic BG16RFOP002-2.077-0496-C01 0.00 1 592.78
2014BG16RFOP002 Innovations and competitiveness Supporting medium-sized enterprises to overcome the economic impact of the COVID-19 pandemic BG16RFOP002-2.077-0678-C01 0.00 21 669.81
2014BG16RFOP002 Innovations and competitiveness Supporting medium-sized enterprises to overcome the economic impact of the COVID-19 pandemic BG16RFOP002-2.077-1280-C01 0.00 9 771.37
2014BG16RFOP002 Innovations and competitiveness Supporting medium-sized enterprises to overcome the economic impact of the COVID-19 pandemic BG16RFOP002-2.077-1332-C01 0.00 0.00
2014BG16RFOP002 Innovations and competitiveness Completion of the preparatory works required to start the construction of the Interconnection Bulgaria - Serbia BG16RFOP002-4.003-0001-C03 0.00 2 841.67
2014BG16M1OP002 Environment Construction of water supply and sewerage infrastructure on the designated territory served by "Water Supply and Sewerage" Ltd. - Stara Zagora BG16M1OP002-1.016-0013-C06 0.00 3 420.00

The organization does not participate in projects as a Subcontractor

The organization does not participate in projects as a member of the Consortium

Notes:

Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).