Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 64 225 TREES
Български

Programme: Transport and Transport Infrastructure

Planning region: All

Participating Organizations

None
Contractor legal entity Contracted Amount* Reported Amount**
101680536 STROY GROUP 279 457.80 59 097.84
205628783 ALFABET CONSULT LTD 13 200.00 0.00
202347731 PIRIN DREAM 8 201.58 9 842.28
205927216 Di Ar Ar Construction 659 991.66 196 082.56
131478565 ENERGOEFFECT CONSULT 5 295.33 5 188.14
203644995 Lachov stroi consult 1 4 936.00 0.00
206496150 "Munin Engineering" Ltd 2 899.88 3 480.00
204536264 DID-Consult Engineering Group 8 799.64 10 560.00
181195121 Energy Engineering 1 479 708.00 313 068.00
None
None

Notes:

* The projected contract value may be lower than the reported one because of any of the following reasons:
  • For physical person, the contracted value does not include the employer expenses, which are admissible expenses and are accounted under the project
  • The Beneficiary has reported expense only with an invoice without a contract with the selected contractor
  • The beneficiary has reported over again expenses to the MA
** This column represents the amount of costs claimed by the beneficiary
Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).