Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 57 343 TREES
Български

Programme: Transport and Transport Infrastructure

Planning region: All

Participating Organizations

None
Contractor legal entity Contracted Amount* Reported Amount**
200992683 PV CONSULT OOD 277 424.88 793 117.21
115745150 BONNER Ltd 13 640.55 38 973.00
124021267 NIKOS HRANENGINEERING LTD 76 530.45 218 661.80
B 11720 ALPMA Alpeland Maschinenbau Ltd 360 062.78 1 029 665.10
175259733 BULTHERM-BULGARIA Ltd. 32 672.54 93 351.60
117626522 RUSYS 136 221.47 389 210.17
115135492 STABILINGENERING - ALFA Ltd 32 418.00 92 700.00
201060059 TECHNO ZID LTD 54 652.50 156 150.00
206069400 BONFARI EOOD 13 656.37 39 018.80
200983990 INOVATEC LTD. 8 933.11 25 523.58
200344163 MULTIVAC BULGARIA 492 861.60 1 408 197.61
202806946 STORM ENGINEERING 20 844.25 59 555.00
None
None

Notes:

* The projected contract value may be lower than the reported one because of any of the following reasons:
  • For physical person, the contracted value does not include the employer expenses, which are admissible expenses and are accounted under the project
  • The Beneficiary has reported expense only with an invoice without a contract with the selected contractor
  • The beneficiary has reported over again expenses to the MA
** This column represents the amount of costs claimed by the beneficiary
Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).