Programme: Transport and Transport Infrastructure 2014-2020

Planning region: All

Financial Information

476 522 526.28 EUR
326 640 300.16 EUR
149 882 226.12 EUR
326 650 371.04 EUR
85.00 %
{point.key}
{point.value}
{point.key}

Financial Corrections

Reason % of financial
correction
Financial corrections amounts1,2 Contract
Grant Self-financing Total
Нарушения в документацията за обществени поръчки 5.00 96 352.89 22 871.43 119 224.32 Joint venture IMI
Нарушения в документацията за обществени поръчки 5.00 616 184.02 146 264.48 762 448.50 Treis group hold
Нарушения в документацията за обществени поръчки 5.00 1 045 415.99 248 151.88 1 293 567.87 Joint venture "GeoMetro Zemlqne"
Липса на адекватна одитна следа 4 140.00 982.72 5 122.72 Joint venture Metro stroitelsvo

Notes:

* The amount of the actual amounts paid cumulative
1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower.
2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment.
Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).