Programme: Transport and Transport Infrastructure

Planning region: All

Financial Information

46 880.57 BGN
37 504.47 BGN
9 376.10 BGN
118 800.30 BGN
85.00 %
{point.key}
{point.value}
{point.key}

Financial Corrections

Reason % of financial
correction
Financial corrections amounts1,2 Contract
Grant Self-financing Total
Конфликт на интереси 100.00 19 840.00 4 960.00 24 800.00 Valentin
Конфликт на интереси 100.00 19 440.00 4 860.00 24 300.00 Pirinsko slunce
Нарушения в документацията за обществени поръчки 2 365.60 591.40 2 957.00 OPA SOLUTIONS LTD.
Конфликт на интереси 100.00 21 428.92 5 357.23 26 786.15 Project-level financial correction
Конфликт на интереси 100.00 6 720.00 1 680.00 8 400.00 Project-level financial correction
Липса на устойчивост 68.43 81 295.83 20 323.93 101 619.76 Project-level financial correction

Notes:

* The amount of the actual amounts paid cumulative
1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower.
2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment.
Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).