Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 56 557 TREES
Български

Programme: Transport and Transport Infrastructure

Planning region: All

Description

Areas for public use and outdoor recreation in the municipality of Peruštitsa play an important role, as they satisfy the basic social and ecological needs of the population of the municipality and it is extremely important that they are in good condition. The project envisages the renovation of areas for public use and outdoor recreation, designed to permanently satisfy the public needs of the population of Peruštitsa municipality.
The project includes the rehabilitation of two children's playgrounds in quarter 65 and quarter 40 in the town of Perushtitsa, due to the compromise of some of the elements of the children's facilities and the adjacent areas. For the children's playground in square 40, it is planned to replace the waste bins; refreshing the wooden fence; repainting an existing wooden bench; dismantling of an old and delivery and installation of a new children's slide; repainting of wooden elements and replacement of metal chains and seats of the combined children's swing for children from 3 to 12 years; repainting the wooden elements of the children's house for themed games "Shop" and the two boards with educational games.
For the children's playground in square 65, replacement and expansion of the shock-absorbing flooring is planned; refreshing the existing wooden fence; separation of entrance/exit from "Peter Bonev" street; repainting of the existing 11 pcs. metal benches; replacement of three waste bins with new ones; repainting the metal elements of the five facilities for children; replacement of the slide and climbing wall of the combined children's facility for children up to 3 years old; replacement of metal chains and seats of a children's swing for children up to 3 years old; replacement of baby swing seats scale; replacement of metal chains and seats of a children's swing for children from 3 to 12 years; replacement of 3 pcs. slides and repair of stairs of a combined children's facility for children from 3 to 12 years old.
Activities
Activity Contracted Amount Reported Amount
Рехабилитация на две детски площадки съгл. КСС: Дейността по рехабилитация на двете детски площадки в гр. Перущица ще бъде изпълнена, посредством изпълнение на строително монтажни работи, съгласно количествена сметка, одобрен архитектурен проект и влязло в сила разрешение за строеж. 0.00 0.00

Notes:

Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).