Programme: Good Governance

Planning region: All

Description

The objective of the investment is to promote the production of renewable energy from geothermal sources by putting into operation a pilot geothermal power plant for the production of electricity and heat.
The investment shall consist in grants for the construction of the selected installations, with the objective of installing at least 10 MW of electricity and 30 MW of heat. The investment shall also provide 3D seismic mapping of deep geothermal reservoirs providing conditions for production and electricity and build a specialised laboratory at university level for research and training on combined geothermal energy system. Amendments to the regulatory framework shall remove key impediments identified in the roadmap for the development of geothermal energy as a renewable energy source, and regulate the use of geothermal energy.
Activities
Activity Contracted Amount Reported Amount
Дейност 1: Консултантски услуги: Консултантски услуги 17 602 470.00 2 249 204.50
Дейност 2: Изграждане на лаборатория: Създаване на специализирана лаборатория за изследвания и обучение в областта на геотермалната енергия. 2 542 579.00 0.00
Дейност 3: Подготвителни проучвателни дейности: Подготвителни проучвателни дейности 2 151 413.00 0.00
Дейност 4: Сондажни дейности : Сондажни дейности 127 128 950.00 0.00
Дейност 5: Изграждане на централа : Изграждане на централа 172 113 040.00 0.00

Notes:

Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).