Name | Address |
---|---|
List of projects in which the organization is involved as a beneficiary (2)
The organization does not participate in projects as a Partner
List of projects in which the organization is involved as a contractor (5)
The organization does not participate in projects as a Subcontractor
List of projects in which the organization is involved as a member of the Consortium
Project Name | UMIS Number | Contracts count | Contracts amount |
---|---|---|---|
Establishment of a Water Management System for the Iskar river basin (WMS-IBR) as Phase I of the National Real Time Water Management System (NRTWMS) | BG16M1OP002-4.002-0001-C05 | 1 | 5 340 000.00 |
Completion and Reconstruction of the Water Supply and Wastewater collection networks in the Designated Territory, serviced by „ViK“ Ltd., Kardzhali, Bulgaria | BG16M1OP002-1.016-0010-C03 | 1 | 629 500.00 |
Technical assistance for strategic environmental assessment of the project for operational program "Transport Connectivity" 2021-2027 | BG16M1OP001-5.001-0031-C01 | 1 | 0.00 |
Notes:
Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN