Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 77 391 TREES
Български

Programme: All

Planning region: Community-led local development (CLLD)

Description

The project involves the construction of a swimming pool measuring 6.00 x 12.00 m with a total volume of 97.2 cubic meters. The pool will be designed for sports and recreational activities, suitable for both individual training and group sessions. The structure will be built with high-quality materials to ensure durability and safety. The project includes a modern filtration system and water heating. The aim is to create a comfortable and functional environment for sports and leisure that will improve the quality of life for the local community.
Activities
Activity Contracted Amount Reported Amount
Изграждане на плувен басейн: Проектното предложение включва изграждане на плувен басейн с размери 6.00 х 12.00 м и общ обем от 97,2 куб.м. Басейнът ще бъде предназначен за спортни и развлекателни дейности, подходящ както за индивидуални тренировки, така и за групови занимания. Конструкцията ще бъде изпълнена с висококачествени материали за осигуряване на дълготрайност и безопасност. Проектът предвижда модерна филтрационна система и подгряване на водата. 80 784.54 80 784.11

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.