Description

With the current project Zhenya Yordanova Miteva PA applies for Sub-measure 4.1 "Investments in agricultural holdings" of the Rural Development Program 2014-2020.
Currently, the main part of the farm is 37.5 decares of hazelnuts, and Jenya Miteva has her own tractor with attached equipment.
An outbuilding with an area of ​​150 sq.m. was designed for the storage of agricultural machinery and future products. in the village of Pchelnik

The designed building is located next to the orchards. The location of the building, together with the good transport accessibility - on an asphalt road, make it extremely convenient both for storage of the production and for preparation for its further realization. According to the attached estimates, the maximum yields on the farm are expected to be within 7.5 tons.
It is planned to store the hazelnuts in this building immediately after the harvest, within a maximum of 1-2 weeks, after which they will be sold depending on the specific circumstances. The building will be used for sorting and filling the hazelnuts in panties.
Apart from the production, the building will be used for storage of the available agricultural machinery - tractor and inventory.
Activities
Activity Contracted Amount Reported Amount
Изграждане на сградата: За съхранението на земеделската техника и бъдещата продукция е проектирана стопанска сграда с площ 150 кв.м. в село Пчелник – отстояща на 500 метра от трайните насаждения 46 206.00 0.00

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.