Financial Information
54 858 390.53
BGN
49 093 706.97
BGN
5 764 683.56
BGN
48 864 703.38
BGN
85.00
%
Financial Corrections
Reason | % of financial correction |
Financial corrections amounts1,2 | Contract | ||
---|---|---|---|---|---|
Grant | Self-financing | Total | |||
Нарушения в документацията за обществени поръчки | 5.00 | 3 060.34 | 345.71 | 3 406.05 | J amp; I Ltd. |
Нарушения в документацията за обществени поръчки | 5.00 | 3 043.67 | 343.83 | 3 387.50 | Astatera Ltd. |
Нарушения в документацията за обществени поръчки** | 10.00 | 126 706.47 | 14 313.53 | 141 020.00 | DZZD Water GIS Design - Silistra |
Нарушения в документацията за обществени поръчки** | 5.00 | 327 188.56 | 36 961.20 | 364 149.76 | DZZD ELIT VIK SILISTRA |
Нарушения в документацията за обществени поръчки | 25.00 | 4 910 100.11 | 554 674.64 | 5 464 774.75 | DZZD KV SILISTRA 2020 |
Нарушения в документацията за обществени поръчки | 25.00 | 4 405 201.94 | 497 638.28 | 4 902 840.22 | DZZD KV SILISTRA 2020 |
Нарушения в документацията за обществени поръчки** | 25.00 | 1 828 169.21 | 206 521.06 | 2 034 690.27 | KV DOROSTOL 2020 |
Нарушения в документацията за обществени поръчки** | 25.00 | 261 302.70 | 29 518.33 | 290 821.03 | DZZD Ingeneering Tutrakan 2020 |
Нарушения в документацията за обществени поръчки | 25.00 | 2 198 650.00 | 248 372.82 | 2 447 022.82 | DZZD Evroingeneering -2020 |
Нарушения в документацията за обществени поръчки** | 5.00 | 19 767.00 | 2 233.00 | 22 000.00 | Interkonsult |
Нарушения в документацията за обществени поръчки** | 5.00 | 43 472.44 | 4 910.91 | 48 383.35 | Geostroi Konsult |
Нарушения в документацията за обществени поръчки** | 5.00 | 136 272.49 | 15 394.16 | 151 666.65 | DZZD "OBEDINENIE VER BG08" |
Notes:
* The amount of the actual amounts paid cumulative
** The beneficiary disputes the financial correction in court in accordance with the Administrative Procedure Code.
1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower.
2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment.
Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
** The beneficiary disputes the financial correction in court in accordance with the Administrative Procedure Code.
1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower.
2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment.
Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN