Financial Information
931 997 052.57
BGN
638 852 898.26
BGN
293 144 154.31
BGN
638 872 595.27
BGN
85.00
%
Financial Corrections
Reason | % of financial correction |
Financial corrections amounts1,2 | Contract | ||
---|---|---|---|---|---|
Grant | Self-financing | Total | |||
Нарушения в документацията за обществени поръчки | 5.00 | 188 449.88 | 44 732.62 | 233 182.50 | Joint venture IMI |
Нарушения в документацията за обществени поръчки | 5.00 | 1 205 151.19 | 286 068.46 | 1 491 219.65 | Treis group hold |
Нарушения в документацията за обществени поръчки | 5.00 | 2 044 655.95 | 485 342.90 | 2 529 998.85 | Joint venture "GeoMetro Zemlqne" |
Липса на адекватна одитна следа | 8 097.13 | 1 922.03 | 10 019.16 | Joint venture Metro stroitelsvo |
Notes:
* The amount of the actual amounts paid cumulative
1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower.
2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment.
Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower.
2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment.
Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN