BG-RRP-4.034-0104-C02
Construction of a standalone energy storage system 49.5 MW/99 MWh with a MV/110 kV boosting substation and EMS – energy management system in the town of Kameno, Burgas region.
176789460 MINISTRY OF ENERGY
26.08.2025
26.08.2025
01.06.2026
In execution (starting date)
Location of Performance
  • Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Burgas (BG341), Kameno, Kameno