Financial Information

231 299.25 BGN
115 649.62 BGN
115 649.63 BGN
115 649.62 BGN
100.00 %
{point.key}
{point.value}
{point.key}

Financial Corrections

Reason % of financial
correction
Financial corrections amounts1,2 Contract
Grant Self-financing Total
Липса на добро финансово управление 25.00 33 624.88 33 624.87 67 249.75 ALFA BUILD ENGINEERING Ltd.

Notes:

* The amount of the actual amounts paid cumulative
1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower.
2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment.
Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).