The current project aims to improve the transport and operational characteristics of the street pavement in the village of Maglen, Aytos municipality, increasing the safety of car and pedestrian traffic, as well as the comfort of travel. The project covers a road section and consists in improving the technical characteristics of the route. The street is 154.53 m long and the width of the traffic lane is 6 m., including two traffic lanes with a width of 3 m each. A dense asphalt mixture is foreseen for wearing layer type "A" with a thickness of 4 cm and non-dense asphalt mixture for the lower layer with a thickness of 4 cm is planned. To improve the drainage, new concrete curbs 18/30/50 and cleaning and raising of existing revision shafts.
Activities
Activity Contracted Amount Reported Amount
Извършване на СМР дейности по проект „Основен ремонт на част от улица № 20 (от О.Т.95 до О.Т.67) по плана на село Мъглен, община Айтос“: Съгласно разработения технически проект ще се изпълнят следните дейности: Основен ремонт на част от улица № 20 (от О.Т.95 до О.Т.67) - Ремонтни дейности улични настилки - подготвителни дейности и изкопни работи; пътни работи; асфалтови работи; - ремонтни дейности тротоарни настилки - пътни работи по полагане на бетонови бордюри; направа на тротоарна настилка с дебелина 10см. с фрезован материал; - повърхностно отводняване; - безопасност на движението - Временна организация на движението; постоянна организация на движението 78 589.69 77 909.98

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.