The farmer grows 32 pcs. cattle and buffaloes, of which 2 pcs. calves and malaccas up to 1 year, 4 pcs. calves and malaccas over 1 year and less than 2 years for fattening, 2 pcs. calves and malaccas over 1 year for breeding and pregnant heifers and 24 pcs. dairy cows. 
The project proposal includes the purchase of machinery and equipment for its activities as follows: a central milk line for 2x15 places with a washing device, an individual watering machine with a valve - 25 pieces and a sub-weight line for cleaning the tore mass. 
The technological process provides for milking in the barn to be carried out with a milking plant type central milk line with 4 milking apparatus with milk meters for precise reading of the flow of milk. The doylic system also has a washing device that serves to clean the system qualitatively using special detergents in accordance with biosecurity requirements. Individual drinkers will ensure that animals have access to suspended and unlimited amounts of drinking water in accordance with welfare and biosecurity requirements. The installation of a sub-staff line for automated cleaning in the cow farm is aimed at increasing the hygiene of both the barn and any place for an animal. The removal of the manure mass immediately after its separation from the animal eliminates the possibility of multiple, development and transmission of possible disease-causing microorganisms or parasites to other animals, the thus increasing biosecurity at the site.  
The project will increase the overall efficiency of the farm, as it currently lacks special equipment and relies entirely on manual labor. Further improve the hygiene conditions in the cow farm.
Activities
Activity Contracted Amount Reported Amount
Закупуване и инсталиране на централен млекопровод за 2х15 места с миещо устройство, индивидуална поилка с клапан - 25 броя и субщангова линия за почистване на торова маса: Ще бъдат закупени и инсталирани централен млекопровод за 2х15 места с миещо устройство, индивидуална поилка с клапан - 25 броя и субщангова линия за почистване на торова маса 125 585.41 125 585.40
Управление на проекта: Цялостно управление и отчитане на проекта в ИСУН 1 255.00 2 000.00

Notes:

Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).