Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 76 958 TREES
Български

Programme: All

Planning region: Burgas

Description

The project involves the installation of a battery energy storage system, which will be integrated into an already built photovoltaic plant with inverters in the enterprise. The main objective of this integration is to maximize the utilization of the solar energy produced by the installed photovoltaic system, by providing the possibility of storing the excess energy generated during periods of high solar activity. This stored energy can be used later during periods of higher energy consumption or in the absence of sunlight, thus ensuring a continuous and reliable energy flow for the enterprise's production needs. The implementation of the battery system will reduce the enterprise's dependence on the electricity distribution network, while at the same time contributing to the optimization of electricity costs. Through better management of energy flows and the possibility of using its own produced and stored energy, the enterprise will be able to reduce its costs related to peak tariffs and possible power outages. In addition to the economic benefits, the energy storage system will provide additional sustainability and energy autonomy to the production process. This is particularly important for ensuring the stability and reliability of production operations, which in turn increases the competitiveness of the company. At the same time, the project is in line with the principles of sustainable development and environmental responsibility, reducing the company's carbon footprint and supporting the transition to cleaner and renewable energy. The measures are fully consistent with national and European policies on energy efficiency and the use of renewable energy sources.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.