Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 55 209 TREES
Български

Organization

Identification

Data Export Excel HTML XML Print
Name Address
119081953 "VDH" AD България, гр.София, 1000, р-н Красно село бул./ул. ул."Шандор Петьофи" № 13-15

List of projects in which the organization is involved as a beneficiary (1)

The organization does not participate in projects as a Partner

List of projects in which the organization is involved as a contractor

Project Name UMIS Number Contracts amount Reported amount
Second phase on project "Rehabilitation of the water supply and sewerage system in town of Bansko with construction of a WWTP BG16M1OP002-1.005-0003-C01 0.00 0.00
Face To Face services in CESA (Center for employment and social assistance) BG05M9OP001-3.002-0001-C05 0.00 0.00
Green and accessible urban environment for the residents of Stara Zagora - phase ІІ BG16RFOP001-1.006-0001-C02 7 052 352.43 6 727 425.73
Reconstruction of the central pedestrian zone BG16RFOP001-1.010-0002-C02 10 417 646.53 11 245 275.01
Construction, complete renovation / reconstruction of 26 schools and kindergartens on the territory of Sofia Municipality BG16RFOP001-1.001-0001-C05 2 283 493.61 2 286 166.12
Rehabilitation and new spatial solutions in the pedestrian zone of the town's central area and rehabilitation of the "Todor Kirkov" Square, Varosha quarter, town of Lovech BG16RFOP001-1.020-0001-C02 1 195 737.52 1 178 702.74
Strengthening of landslide SLV 20.07613-09 on the territory of village 'Kachulka' (former village 'Kachulka'), Sliven Municipality BG16M1OP002-4.003-0012-C01 339 239.59 438 296.35
Restoration and conservation of habitats and species in Central Balkan National Park BG16M1OP002-3.007-0006-C07 0.00 0.00
Rehabilitation of Railway line Plovdiv – Burgas, Phase 2 - Stage 1 BG16M1OP001-1.001-0003-C05 13 210 113.99 16 144 635.67
Modernization of the Sofia - Plovdiv railway line: railway section Elin Pelin - Kostenets BG16M1OP001-1.001-0004-C03 0.00 0.00
Construction of a covered boat shelter in the aquatory to the west of the Fishing port area (former Chengene skele area), Burgas Municipality BG14MFOP001-1.009-0004-C06 0.00 0.00
Green spaces development and physical environment improvement of the Station Garden in Stara Zagora BG16RFOP001-1.006-0005-C01 4 000 000.00 4 374 854.14
Reconstruction of Stara Zagora and Nova Zagora Railway Station Complexes - Phase 1 BG16M1OP001-3.001-0009-C05 3 375 270.34 2 704 205.04
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 BG16RFOP002-2.073-10065-C01 0.00 2 407.00
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 BG16RFOP002-2.073-17036-C01 0.00 1 906.92
Sofia Integrated Urban Transport - II stage BG16RFOP001-1.041-0001-C07 47 747 139.77 38 599 925.16
Prevention and counteraction of landslide processes on the Republican road network - Phase 2 BG16M1OP002-4.003-0010-C05 0.00 0.00
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 BG16RFOP002-2.073-6956-C01 0.00 2 587.05
Construction of water supply and sewerage infrastructure on the designated territory serviced by Water Supply and Sewerage Ltd. - Vratsa BG16M1OP002-1.016-0002-C03 354 006.45 442 554.00
Construction of water supply and sewerage infrastructure on the designated territory serviced by Water Supply and Sewerage Ltd., Vidin BG16M1OP002-1.016-0006-C06 5 258 696.85 0.00
Restoration of damage to forests of the municipality It has been haunted by forest fires, natural disasters and catastrophic events BG06RDNP001-8.004-0037-C05 621 873.04 715 144.78
Lot 34 „Road III-559 Polski gradezt – Topolovgrad - Ustrem from km 4+500 to km 23+520 and from km 35+060 to km 39+450, with a total length of 23,41 km, region of Haskovo” BG16RFOP001-7.001-0034-C05 0.00 0.00
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 BG16RFOP002-2.073-3922-C01 0.00 0.00
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 BG16RFOP002-2.073-3922-C01 0.00 4 594.21
Modernization of Sofia – Dragoman – Serbian border Railway line: section Voluyak – Dragoman phase 1 BG16M1OP001-1.001-0006-C01 0.00 0.00
From East2West - 2. Access to OEM Corridor through the Core Port of Burgas: Rehabilitation of the rail connections towards the Trans-European Transport Network. BG16M1OP001-1.001-0005-C03 6 537 096.44 7 247 038.85
Integrated Water Project for the District of Burgas BG16M1OP002-1.016-0011-C07 3 149 593.76 504 808.80
Recovering SMEs by improving energy efficiency BG16RFOP002-6.002-0923-C01 149 749.50 299 499.00
Rehabilitation of Railway line Plovdiv – Burgas, Phase 2 - Stage II BG16FFPR001-1.001-0001-C01 9 042 618.89 0.00

The organization does not participate in projects as a Subcontractor

List of projects in which the organization is involved as a member of the Consortium (10)

Notes:

Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).