BG16RFPR001-2.004-2619-C01
Improving the energy efficiency of the La Bottega restaurant through thermal insulation systems of sandwich panels for the roof and replacement of transparent enclosing elements with aluminum joinery on the walls with a broken thermal bridge and delivery and installation of a VRV/VRF heat pump. small peak loads. Implementation period – up to 12 months.
177549112 Ministry of Innovation and Digital Transformation
22.04.2026
22.04.2026
22.04.2027
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South-West (BG41), Sofia cap. (BG411), Sofia Cap., Sofia
