| UMIS Number | BG-RRP-4.033-0026-C01 |
| Project Name | ContourGlobal Maritsa Solar Hybrid hub Photovoltaic power plant with an integrated battery for electricity storage |
| Beneficiary | 207455650 ContourGlobal Maritsa Solar EAD |
| Funding | RRF ==> Recovery and Resilience Plan |
| Date of the Contract/Order | 19.03.2025 |
| Start Date | 19.03.2025 |
| End Date | 31.03.2026 |
| Status of Implementation of the Contract/Order of the Grant | In execution (starting date) |
| Location of Performance |
|
| Brief description |
Изграждане на нова Фотоволтаична електроцентрала с инсталирана мощност 75.3 MW с интегрирано локално съоръжение за съхранение (ЛСС) на електрическа енергия в с.Искрица и с. Медникарово, общ. Гълъбово |
| Activities |
|
| Partners | None |
| Contractors |
|
| Subcontractors | None |
| Members of the Consortium | None |
|
Notes: * The projected contract value may be lower than the reported one because of any of the following reasons:
** This column represents the amount of costs claimed by the beneficiary |
|
| Indicator 1 | Installed and commissioned part of new renewable electricity generation capacity (in case applying for only part of the planned new renewable electricity generation capacity), Measure Unit: MW, Base Value: 0.00 , Target amount: 0.00 , Reached amount: 0.00 |
| Indicator 2 | Capacity of the installed storage, Measure Unit: MWh, Base Value: 0.00 , Target amount: 48.00 , Reached amount: 0.00 |
| Indicator 3 | Installed and put into operation new capacities for the production of electricity from renewable energy (wind and/or solar energy), Measure Unit: MW, Base Value: 0.00 , Target amount: 75.30 , Reached amount: 0.00 |
| Indicator 4 | Installed and put into operation new capacities for electricity storage, Measure Unit: MW, Base Value: 0.00 , Target amount: 24.00 , Reached amount: 0.00 |
| Total Project cost | 11 020 044.42 EUR |
| Grant | 3 857 015.55 EUR |
| Self amount | 7 163 028.87 EUR |
| Total actual amounts paid | 0.00 EUR |
| Percentage of EU co-financing | 100.00 % |
| None | |
|
Notes: 1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower. 2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment. |
|
| There are no tender procedures |
Notes:
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN