| UMIS Number | BG-RRP-4.032-0101-C01 |
| Project Name | Construction of new facilities for the production of electrical energy from solar energy "FEC-TA-Pavel" and a local storage system with a power of 0.4 MW and a capacity of 0.8736 MWh., located regulated landed property II, quarter 99, village of Pavel with EKATTE 55018, municipality of Polski Trumbesh |
| Beneficiary | 203546184 TERA AKVA 2015 LTD |
| Funding | RRF ==> Recovery and Resilience Plan |
| Date of the Contract/Order | 12.02.2025 |
| Start Date | 12.02.2025 |
| End Date | 31.03.2026 |
| Status of Implementation of the Contract/Order of the Grant | In execution (starting date) |
| Location of Performance |
|
| Brief description |
Предложението за изпълнение на инвестиции (ПИИ) е насочено към изгражадане на нови мощности за производство на електроенергия от възобновяеми източници (слънчева енергия) с инсталирана мощност за производство 800 kW и локална система за съхранение на електрическа енергия (ЛСС) с мощност 400 kW и капацитет 873.6 kWh разположена в УПИ II, кв. 99, с. Павел с ЕКАТТЕ 55018, община Полски Тръмбеш. Електрическата централа се присъединява към електроразпределителната мрежа на "Електроразпределение Север" АД, съгласно договор за присъединяване № ПД-ПВИ-84 от 16.05.2022г. Крайния получател няма да използва произведената електроенергия за собствено потребление. Предвидените мерки за изпълнение са в пълно съответствие с Инвестиция C4.I6 „Подкрепа за нови мощности за производство на електроенергия от възобновяеми източници и съхранение на електроенергия“ от НПВУ. ПИИ ще допренесе за изпълнението на националната цел за постигане на климатична неутралност до 2050 г. като създава условия за намаляване на годишните въглеродни емисии от сектора за производство на електрическа енергия и увеличава дела на електрическата енергия от ВИ и интегрирането на производствените мощности от ВИ в мрежата при гарантиране сигурността и стабилността на електроенергийната система. Инвестицията ще се изпълнява при спазване на принципа за „ненанасяне на значителни вреди“ и с принципите за равнопоставеност на жените и мъжете и осигуряване на равни възможности за всички. |
| Activities |
|
| Partners | None |
| Contractors |
|
| Subcontractors | None |
| Members of the Consortium | None |
|
Notes: * The projected contract value may be lower than the reported one because of any of the following reasons:
** This column represents the amount of costs claimed by the beneficiary |
|
| Indicator 1 | Installed and put into operation new capacities for electricity storage, Measure Unit: MW, Base Value: 0.00 , Target amount: 0.40 , Reached amount: 0.40 |
| Indicator 2 | Capacity of the installed storage, Measure Unit: MWh, Base Value: 0.00 , Target amount: 0.87 , Reached amount: 0.88 |
| Indicator 3 | Installed and put into operation new capacities for the production of electricity from renewable energy (wind and/or solar energy), Measure Unit: MW, Base Value: 0.00 , Target amount: 0.80 , Reached amount: 0.80 |
| Total Project cost | 238 773.31 EUR |
| Grant | 119 386.65 EUR |
| Self amount | 119 386.66 EUR |
| Total actual amounts paid | 119 299.73 EUR |
| Percentage of EU co-financing | 100.00 % |
| None | |
|
Notes: 1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower. 2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment. |
|
| Procedure 1 |
Subject to due process: „Локална система за съхранение на електроенергия с мощност 0,4 MW и капацитет 0,88038MWh, с местонахождение УПИ II, кв. 99, с. Павел с ЕКАТТЕ 55018, община Полски Тръмбеш“,
Estimated Amount: 467 000.00
|
Notes:
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN