| UMIS Number | BG-RRP-4.032-0052-C01 |
| Project Name | Construction of a combined project for the production of electrical energy from a photovoltaic plant with a capacity of 999,765 KW and ESS with a capacity of 450 KW |
| Beneficiary | 207286563 “BOLKAN SUN POWER” LTD. |
| Funding | RRF ==> Recovery and Resilience Plan |
| Date of the Contract/Order | 05.03.2025 |
| Start Date | 05.03.2025 |
| End Date | 31.03.2026 |
| Status of Implementation of the Contract/Order of the Grant | In execution (starting date) |
| Location of Performance |
|
| Brief description |
Настоящето предложение за инвестиция се отнася за изграждане на комбиниран проект от фотоволтаична централа с мощност 999,765 KW и монтиране към нея на ЛСС с мощност 450 KW. Целта на изграждане на съоръжението е продажба на произведената ел. енергия. Мястото на изпълнение на инвестицията е в с. Николово, общ. Монтана. При изпълнението на проекта ще бъдат спазвани всички законови и нормативни уредби. Планираните дейности ще бъдат извършени от външен изпълнител. Като технически ръководител е наето лице с необходимата професионална квалификация и опит. Обектът ще бъде присъединен към електроразпределителната мрежа на „ЕЛЕКТРОРАЗПРЕДЕЛИТЕЛНИ МРЕЖИ ЗАПАД“ ЕАД. Срокът за изпълнение на проекта е 18 месеца. |
| Activities |
|
| Partners | None |
| Contractors |
|
| Subcontractors | None |
| Members of the Consortium |
|
|
Notes: * The projected contract value may be lower than the reported one because of any of the following reasons:
** This column represents the amount of costs claimed by the beneficiary |
|
| Indicator 1 | Installed and put into operation new capacities for electricity storage, Measure Unit: MW, Base Value: 0.00 , Target amount: 0.45 , Reached amount: 0.00 |
| Indicator 2 | Capacity of the installed storage, Measure Unit: MWh, Base Value: 0.00 , Target amount: 0.97 , Reached amount: 0.00 |
| Indicator 3 | Installed and put into operation new capacities for the production of electricity from renewable energy (wind and/or solar energy), Measure Unit: MW, Base Value: 0.00 , Target amount: 1.00 , Reached amount: 1.00 |
| Total Project cost | 374 521.30 EUR |
| Grant | 187 260.65 EUR |
| Self amount | 187 260.65 EUR |
| Total actual amounts paid | 0.00 EUR |
| Percentage of EU co-financing | 100.00 % |
| None | |
|
Notes: 1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower. 2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment. |
|
| There are no tender procedures |
Notes:
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN