| UMIS Number | BG-RRP-4.032-0132-C02 |
| Project Name | Construction of a new installation, combining a Photovoltaic plant (PhEC) with a capacity of 1.2MW in combination with Local Storage Facilities (BESS) of electric energy with a capacity of 0.6MW in property UPI XXIX-1787, quarter 26, Industrial Zone East, city Topolovgrad, region Haskovo |
| Beneficiary | 200746742 MPPV |
| Funding | RRF ==> Recovery and Resilience Plan |
| Date of the Contract/Order | 15.01.2025 |
| Start Date | 15.01.2025 |
| End Date | 30.06.2026 |
| Status of Implementation of the Contract/Order of the Grant | In execution (starting date) |
| Location of Performance |
|
| Brief description |
Настоящото проектно предложение е за получаване на безвъзмездна помощ за разходите за доставка и монтаж на ЛСС на електрическа енергия с капацитет 1.56 MWh и 0.6 MW инсталирана мощност към фотоволтаична система с номинална променливотокова мощност 1.2 MW. За изграждането на мрежовата ФЕЦ, част от комбинирания проект, има издадено и влязло в сила разрешение за строеж от 06.10.2023 г. На 19.05.2023 г. е подписан предварителен договор за присъединяване на обект за производство на електрическа енергия към електроразпределителната мрежа на "Електроразпределение Юг" ЕАД. Комбинираният проект ще се изпълни в разположена в гр. Тополо вград, обл. Хасково, имот УПИ XXIX-1787, кв. 26, Промишлена зона Изток. Дейностите по изпълнение на комбинирания проект ще се извърши от лица, притежаващи необходимия опит за извършването на тази дейност. Техническият ръководител на проекта има опит в изпълнението на редица проекти за изграждане на ФЕЦ, включително такива с мощности от 10 MW. Към настоящия момент не са стартирали дейностите по изграждане нито на ФЕЦ-а, нито на ЛСС. |
| Activities |
|
| Partners | None |
| Contractors |
|
| Subcontractors | None |
| Members of the Consortium | None |
|
Notes: * The projected contract value may be lower than the reported one because of any of the following reasons:
** This column represents the amount of costs claimed by the beneficiary |
|
| Indicator 1 | Installed and put into operation new capacities for electricity storage, Measure Unit: MW, Base Value: 0.00 , Target amount: 0.60 , Reached amount: 0.00 |
| Indicator 2 | Capacity of the installed storage, Measure Unit: MWh, Base Value: 0.00 , Target amount: 1.56 , Reached amount: 0.00 |
| Indicator 3 | Installed and put into operation new capacities for the production of electricity from renewable energy (wind and/or solar energy), Measure Unit: MW, Base Value: 0.00 , Target amount: 1.20 , Reached amount: 0.00 |
| Total Project cost | 338 679.74 EUR |
| Grant | 169 339.87 EUR |
| Self amount | 169 339.87 EUR |
| Total actual amounts paid | 0.00 EUR |
| Percentage of EU co-financing | 100.00 % |
| None | |
|
Notes: 1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower. 2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment. |
|
| Procedure 1 |
Subject to due process: Доставка и монтаж на ЛСС с мощност 0.6 MW и капацитет 1.56 MWh,
Estimated Amount: 662 400.00
|
Notes:
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN