| UMIS Number | BG-RRP-4.032-0160-C01 |
| Project Name | Construction of a Photovoltaic power plant Kristal 2 owned by Vrachev 2 EOOD with an installed capacity of up to 992 kW equipped with local energy storage system with an installed capacity of 496 kW. |
| Beneficiary | 831927744 VRACHEV 2 EOOD |
| Funding | RRF ==> Recovery and Resilience Plan |
| Date of the Contract/Order | 12.03.2025 |
| Start Date | 12.03.2025 |
| End Date | 31.03.2026 |
| Status of Implementation of the Contract/Order of the Grant | In execution (starting date) |
| Location of Performance |
|
| Brief description |
Врачев 2 ЕООД строителна компания, която има намерения за разширяване дейността си и в областта на производството на електроенергия от възобновяеми източници чрез изграждане на нови ФЕЦ за продажба на електронеергия. Комбинирането на такъв проект с локални съоръжения за съхранение на енергията (ЛСС) доразвива ефективността на инвестицията. Проектното предложение се отнася до подобряване на конкурентоспособноста на компанията чрез инвестиция за изграждане на нова фотоволтаична електроцентрала с инсталирана мощност от 992kW в имоти собственост на дружеството - свободни терени, комбинирана с локални съоръжения за съхранение на енергия. За реализация на проектното предложение е сключен предварителен договор за присъединяване към електроразпределителната мрежа съгласно който общата инсталирана (пикова) мощност на ФЕЦ е предвидена да бъде 992 kW. Производството на електрическа енергия от ВИ е непостоянно и внедряването на фотоволтаична производствена мощност с локални съоръжения за съхранение ще спомогне за ефективност в реализацията на произвежданата електроенергия в по-широк диапазон от време. Също така реализацията на комбиниран проект ще доведе до подобряване на условията за балансиране на инсталираните мощности и повишаване на конкурентноспособността на производството от конкретната ФЕЦ. Проектът ще бъде изпълнен в съответствие с приложимите технически изисквания и при пазарни условия от трети страни, не свързани с компанията. Инсталирането на ЛСС ще се извърши от лица, притежаващи необходимата професионална квалификация и отговарящи на нормативните изисквания за извършването на тази дейност. |
| Activities |
|
| Partners | None |
| Contractors |
|
| Subcontractors | None |
| Members of the Consortium | None |
|
Notes: * The projected contract value may be lower than the reported one because of any of the following reasons:
** This column represents the amount of costs claimed by the beneficiary |
|
| Indicator 1 | Installed and put into operation new capacities for electricity storage, Measure Unit: MW, Base Value: 0.00 , Target amount: 0.50 , Reached amount: 0.00 |
| Indicator 2 | Capacity of the installed storage, Measure Unit: MWh, Base Value: 0.00 , Target amount: 1.40 , Reached amount: 0.00 |
| Indicator 3 | Installed and put into operation new capacities for the production of electricity from renewable energy (wind and/or solar energy), Measure Unit: MW, Base Value: 0.00 , Target amount: 1.00 , Reached amount: 0.00 |
| Total Project cost | 353 260.01 EUR |
| Grant | 176 630.00 EUR |
| Self amount | 176 630.01 EUR |
| Total actual amounts paid | 0.00 EUR |
| Percentage of EU co-financing | 100.00 % |
| None | |
|
Notes: 1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower. 2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment. |
|
| Procedure 1 |
Subject to due process: Доставка на съоръжение за съхранение на енергия с инсталирана мощност от 500 kW, което да се инсталира към ФЕЦ „Кристал 2“ .,
Estimated Amount: 0.00
|
| Procedure 2 |
Subject to due process: Изборът на изпълнител за СМР - изграждане, монтаж, настройки, въвеждане в експлоатация на ЛСС с инсталирана мощност 500 kW към ФEЦ "Кристал 2" и доставка, монтаж и настройки на EMS система за енергиен мениджмънт ,
Estimated Amount: 0.00
|
| Procedure 3 |
Subject to due process: Надзор на проекта и оценка за съответствие на проекта за ЛСС към ФЕЦ Кристал 2,
Estimated Amount: 0.00
|
| Procedure 4 |
Subject to due process: Проектиране на локална система за съхранение на енергия към ФЕЦ „Кристал 2“,
Estimated Amount: 0.00
|
| Procedure 5 |
Subject to due process: Строителен надзор в строителството на ЛСС с инсталирана мощност от 500 kW към ФЕЦ „Кристал 2“ ,
Estimated Amount: 0.00
|
Notes:
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN