Identification

UMIS Number BG-RRP-4.032-0307-C02
Project Name Construction of a combined project for new installed capacity for the production of electricity from solar energy and for local electricity storage facilities
Beneficiary 207588800 "EMSTROY ENERDGY 9" EOOD
Funding RRF ==> Recovery and Resilience Plan
Date of the Contract/Order 09.11.2025
Start Date 09.11.2025
End Date 30.06.2026
Status of Implementation of the Contract/Order of the Grant In execution (starting date)
Location of Performance
  • България, Югозападна и южно-централна България (BG4), Югозападен (BG41), София-Област (BG412), Ихтиман, с.Вакарел

Description

Brief description
Проектното предложение предвижда реализация на комбиниран проект включащ:
   -изграждане на нова инсталирана мощност за производство на електрическа енергия от слънчева енергия - компонент "производство" на комбинирания проект - фотоволтаична инсталация 600kW в поземлен имот с идентификатор 10029.135.30, в местност Церака, с.Вакарел, община Ихтиман  и 
   -изграждане на локални съоръжения за съхранение на електрическа енергия (ЛСС) - компонент " съхранение" на комбинирания проект - контейнерна батерийна система за съхранение на енергия с проектирана номинална мощност и капацитет от 300kW/650kWh.
Activities
  • Activity: Доставка и монтаж на контейнерна батерийна система за съхранение на енергия : Дейността включва доставка и монтаж на 1 бр. контейнерна батерийна система за съхранение на енергия с проектирана номинална мощност от 300kW и капацитет от 650kWh. Спецификацията на всеки комплект 300kW/650kWh включва основно: -20HQ рамков контейнер; -1 комплект PCS с номинална мощност от 300kW; -1 комплекта от 300kWh външни батерийни шкафове -(всеки комплект външни батерийни шкафове се състои от 12*1P20S- 280Ah акумулаторни модули свързани последователно; -батерийният шкаф е оборудван с независима противопожарна система, система за контрол на температурата, управление на батерията система, електроразпределителна система и спомагателна система., Contracted Amount: 245 420.10 , Reported Amount: 0.00

Participating Organizations

Partners None
Contractors None
Subcontractors None
Members of the Consortium None

Notes:

* The projected contract value may be lower than the reported one because of any of the following reasons:

  • For physical person, the contracted value does not include the employer expenses, which are admissible expenses and are accounted under the project
  • The Beneficiary has reported expense only with an invoice without a contract with the selected contractor
  • The beneficiary has reported over again expenses to the MA

** This column represents the amount of costs claimed by the beneficiary

Indicators

Indicator 1 Installed and put into operation new capacities for electricity storage, Measure Unit: MW, Base Value: 0.00 , Target amount: 0.30 , Reached amount: 0.00
Indicator 2 Capacity of the installed storage, Measure Unit: MWh, Base Value: 0.00 , Target amount: 0.65 , Reached amount: 0.00
Indicator 3 Installed and put into operation new capacities for the production of electricity from renewable energy (wind and/or solar energy), Measure Unit: MW, Base Value: 0.00 , Target amount: 0.60 , Reached amount: 0.00

Financial Information

Total Project cost 245 420.10 EUR
Grant 122 710.05 EUR
Self amount 122 710.05 EUR
Total actual amounts paid 0.00 EUR
Percentage of EU co-financing 100.00 %

Financial Corrections

None

Notes:

1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower.

2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment.

Procurements

There are no tender procedures

Notes:

All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN