Identification

UMIS Number BG-RRP-4.032-0271-C01
Project Name Construction of an energy storage facility for the "Photovoltaic facility for the production of electrical energy, located on the ground and roof of a building in a land property with identifier 15761.32.40 in the village of Golyam Izvor, Samuil municipality, Razgrad district
Beneficiary 207800228 SPRING SOLAR
Funding RRF ==> Recovery and Resilience Plan
Date of the Contract/Order 19.03.2025
Start Date 19.03.2025
End Date 31.03.2026
Status of Implementation of the Contract/Order of the Grant In execution (starting date)
Location of Performance
  • България, Северна и югоизточна България (BG3), Северен централен (BG32), Разград (BG324), Самуил, с.Голям извор

Description

Brief description
Съоръжението за съхранение на ел.енергия към ФЕЦ с номинлна мощност от 600 kW, е предвиден в размер на 300kW  и с общ капацитет от 614.4 kWh. Системата ще се състои от 6 отделни модула с мощност от 50kW и капацитет от 102,4 kWh
Activities
  • Activity: доставка на ЛСС/локална система за съхранение/ на ел.енергия от 300 kW: запитване към доставчик с общи изисквания по посочените параметри по проект , Contracted Amount: 204 516.75 , Reported Amount: 188 912.12
  • Activity: монтаж и свързване на ЛСС/локална системата за съхранение/ на ел.енергия към новоизградена ФЕЦ от 600 kW: подготовка на фундамент за монтаж на 6 броя ЛСС, монтаж и свързането им към захранване и подаване на ел.енергия;, Contracted Amount: 5 112.92 , Reported Amount: 0.00
  • Activity: настройки и пускане на ЛСС/локална системата за съхранение/ на ел.енергия: свързване на системата с Интернет, настройки на отделните лелементи . Изграждане на мониторингова система за упрасвление и следене на ЛСС., Contracted Amount: 2 556.46 , Reported Amount: 0.00

Participating Organizations

Partners None
Contractors
  • Contractor: Asashi Elektrik Ltd, Contracted Amount*: 78 713.39 , Reported Amount**: 188 912.12
Subcontractors None
Members of the Consortium None

Notes:

* The projected contract value may be lower than the reported one because of any of the following reasons:

  • For physical person, the contracted value does not include the employer expenses, which are admissible expenses and are accounted under the project
  • The Beneficiary has reported expense only with an invoice without a contract with the selected contractor
  • The beneficiary has reported over again expenses to the MA

** This column represents the amount of costs claimed by the beneficiary

Indicators

Indicator 1 Installed and put into operation new capacities for electricity storage, Measure Unit: MW, Base Value: 0.00 , Target amount: 0.30 , Reached amount: 0.00
Indicator 2 Capacity of the installed storage, Measure Unit: MWh, Base Value: 0.00 , Target amount: 0.61 , Reached amount: 0.00
Indicator 3 Installed and put into operation new capacities for the production of electricity from renewable energy (wind and/or solar energy), Measure Unit: MW, Base Value: 0.00 , Target amount: 0.60 , Reached amount: 0.00

Financial Information

Total Project cost 212 186.14 EUR
Grant 102 258.38 EUR
Self amount 109 927.76 EUR
Total actual amounts paid 0.00 EUR
Percentage of EU co-financing 100.00 %

Financial Corrections

None

Notes:

1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower.

2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment.

Procurements

Procedure 1 Subject to due process: доставка на система за съхранение на ел.енергия ; инсталиране и монтаж ; пускане и настройка ., Estimated Amount: 212 186.13

Notes:

All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN