Identification

UMIS Number BG-RRP-4.032-0260-C02
Project Name Construction of a combined project for new installed capacity for the production of electricity from solar energy and for local electricity storage facilities
Beneficiary 101747052 "CAD - PROJECT" EOOD
Funding RRF ==> Recovery and Resilience Plan
Date of the Contract/Order 18.02.2025
Start Date 18.02.2025
End Date 30.06.2026
Status of Implementation of the Contract/Order of the Grant In execution (starting date)
Location of Performance
  • България, Северна и югоизточна България (BG3), Северен централен (BG32), Велико Търново (BG321), Златарица, гр.Златарица

Description

Brief description
Проектното предложение предвижда реализация на комбиниран проект включащ:
   -изграждане на нова инсталирана мощност за производство на електрическа енергия от слънчева енергия - компонент "производство" на комбинирания проект - фотоволтаична централа с мощност до 1,4 MW, в имот с идентификатор 30962.501.57, гр. Златарица, Общ. Златарица, Обл. Велико Търново и 
   -изграждане на локални съоръжения за съхранение на електрическа енергия (ЛСС) - компонент " съхранение" на комбинирания проект - контейнерна батерийна система за съхранение на енергия с проектирана номинална мощност и капацитет от 600kW/1200kWh.
Activities
  • Activity: Доставка и монтаж на 1контейнерна батерийна система за съхранение на енергия : Дейността включва доставка и монтаж на 1 бр. контейнерна батерийна система за съхранение на енергия с проектирана номинална мощност от 600kW и капацитет от 1200kWh. Спецификацията на всеки комплект 600kW/1200kWh включва основно: -20HQ рамков контейнер; -1 комплект PCS с номинална мощност от 600kW; -6 комплекта от 200kWh външни батерийни шкафове -(всеки комплект външни батерийни шкафове се състои от 12*1P20S- 280Ah акумулаторни модули свързани последователно; -батерийният шкаф е оборудван с независима противопожарна система, система за контрол на температурата, управление на батерията система, електроразпределителна система и спомагателна система., Contracted Amount: 465 275.61 , Reported Amount: 0.00

Participating Organizations

Partners None
Contractors None
Subcontractors None
Members of the Consortium None

Notes:

* The projected contract value may be lower than the reported one because of any of the following reasons:

  • For physical person, the contracted value does not include the employer expenses, which are admissible expenses and are accounted under the project
  • The Beneficiary has reported expense only with an invoice without a contract with the selected contractor
  • The beneficiary has reported over again expenses to the MA

** This column represents the amount of costs claimed by the beneficiary

Indicators

Indicator 1 Installed and put into operation new capacities for electricity storage, Measure Unit: MW, Base Value: 0.00 , Target amount: 0.60 , Reached amount: 0.00
Indicator 2 Capacity of the installed storage, Measure Unit: MWh, Base Value: 0.00 , Target amount: 1.20 , Reached amount: 0.00
Indicator 3 Installed and put into operation new capacities for the production of electricity from renewable energy (wind and/or solar energy), Measure Unit: MW, Base Value: 0.00 , Target amount: 1.40 , Reached amount: 0.00

Financial Information

Total Project cost 465 275.61 EUR
Grant 232 637.80 EUR
Self amount 232 637.81 EUR
Total actual amounts paid 0.00 EUR
Percentage of EU co-financing 100.00 %

Financial Corrections

None

Notes:

1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower.

2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment.

Procurements

There are no tender procedures

Notes:

All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN