| UMIS Number | BG-RRP-4.032-0285-C01 |
| Project Name | Construction of a local energy storage system (LSS) with an installed capacity of 1MW and a storage capacity of 2MWh for a photovoltaic plant "YOGLAV" with an installed capacity of 2,1MW |
| Beneficiary | 204836653 GERA 2000 Ltd. |
| Funding | RRF ==> Recovery and Resilience Plan |
| Date of the Contract/Order | 07.03.2025 |
| Start Date | 07.03.2025 |
| End Date | 31.03.2026 |
| Status of Implementation of the Contract/Order of the Grant | In execution (starting date) |
| Location of Performance |
|
| Brief description |
Настоящото проектно предложение предвижда изграждане на локално съоръжение за съхранение на електроенергия с мощност 1МW и капацитет 2MWh. Съоръжението ще бъде свързано към фотоволтаична инсталация "Йоглав" с инсталирана AC мощност 2,1MW, собственост на кандидата "ГЕРА 2000" ООД, разположена в поземлен имот в землището на гр. Ловеч, обл. Ловеч. Предвиденото локално съоръжение за съхранение на електроенергия, както и фотоволтаичната централа за производство на електрическа енергия, отговарят на изискването за "нова мощност". Проектното предложение ще се реализира чрез Дейност "Изграждане на комбиниран проект за нова инсталирана мощност за производство на електрическа енергия от слънчева енергия и за ЛСС", като с изграждането на системата за съхранение ще се постигне оптимизация на употребата на електроенергия от фотоволтаичния парк. Дейността е съобразена с изискванията на принципите на равнопоставеност на жените и мъжете и осигуряване на равни възможности за всички, както и с принципа за „ненанасяне на значителни вреди“ върху околната среда и ще допринесе за екологичния преход на страната. Очакваните резултати от реализацията на проекта са: 1) Изградено и пуснато в експлоатация локално съоръжение за съхранение на електроенергия с мощност 1MW и с минимален капацитет от 2MWh, свързано към фотоволтаична инсталация с инсталирана AC мощност 2,1MW; 2) Изградени и пуснати в експлоатация мощности за съхранение като част от комбиниран проект за изграждане на нова мощност за производство на електрическа енергия от слънчева енергия и за нейното съхранение; 3) Внедрени комбинирани мощности за производство и съхранение на енергия от ВИ за преодоляване на проблемите с непостоянно производство и дисбаланси на електроенергийната система; 4) Изградени мощности за ползване на електроенергия с редуциран въглероден отпечатък и влияние върху околната среда. |
| Activities |
|
| Partners | None |
| Contractors |
|
| Subcontractors | None |
| Members of the Consortium | None |
|
Notes: * The projected contract value may be lower than the reported one because of any of the following reasons:
** This column represents the amount of costs claimed by the beneficiary |
|
| Indicator 1 | Installed and put into operation new capacities for electricity storage, Measure Unit: MW, Base Value: 0.00 , Target amount: 1.00 , Reached amount: 0.00 |
| Indicator 2 | Capacity of the installed storage, Measure Unit: MWh, Base Value: 0.00 , Target amount: 2.00 , Reached amount: 0.00 |
| Indicator 3 | Installed and put into operation new capacities for the production of electricity from renewable energy (wind and/or solar energy), Measure Unit: MW, Base Value: 0.00 , Target amount: 2.10 , Reached amount: 0.00 |
| Total Project cost | 497 819.34 EUR |
| Grant | 248 909.67 EUR |
| Self amount | 248 909.67 EUR |
| Total actual amounts paid | 0.00 EUR |
| Percentage of EU co-financing | 100.00 % |
| None | |
|
Notes: 1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower. 2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment. |
|
| Procedure 1 |
Subject to due process: Доставка на активи и изграждане на обект "Разширение на съществуващ трафопост и изграждане на локални съоръжения за съхранение на електрическа енергията с инсталирана мощност 1000 kW и минимален 2000 kWh към проект на „Фотоволтаична електроцентрала за продажба на електрическа енергия с обща инсталирана мощност 2499,21кWp в ПИ 43952.53.246, УПИ IV-23,24 местност „Музговото“, гр. Ловеч, присъединена към ел. провод „ЙОГЛАВ",
Estimated Amount: 481 713.65
|
| Procedure 2 |
Subject to due process: Изготвяне на Оценка на съответствието на инвестиционни проекти със съществуващите изисквания към строежите, съгл. изискванията на чл. 142, ал. 6, т. 2 на ЗИД на ЗУТ и упражняване на строителен надзор по време на строителство за обект „Разширение на съществуващ трафопост и изграждане на локални съоръжения за съхранение на електрическа енергията с инсталирана мощност 1000 kW и минимален 2000 kWh към проект на „Фотоволтаична електроцентрала за продажба на електрическа енергия с обща инсталирана мощност 2499,21кWp в ПИ 43952.53.246, УПИ IV-23,24 местност „Музговото“, гр. Ловеч, присъединена към ел. провод „ЙОГЛАВ“, Етап 2 „Изграждане на локални съоръжения за съхранение на електрическа енергията с инсталирана мощност 1000 kW и минимален 2000 kWh“,
Estimated Amount: 5 368.56
|
| Procedure 3 |
Subject to due process: Разработване на проектна документация във фаза технически проект за обект „Разширение на съществуващ трафопост и изграждане на локални съоръжения за съхранение на електрическа енергията с инсталирана мощност 1000 kW и минимален 2000 kWh към проект на „Фотоволтаична електроцентрала за продажба на електрическа енергия с обща инсталирана мощност 2499,21кWp в ПИ 43952.53.246, УПИ IV-23,24 местност „Музговото“, гр. Ловеч, присъединена към ел. провод „ЙОГЛАВ“, Етап 2 „Изграждане на локални съоръжения за съхранение на електрическа енергията с инсталирана мощност 1000 kW и минимален 2000 kWh“,
Estimated Amount: 6 391.15
|
Notes:
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN