| UMIS Number | BG-RRP-4.032-0229-C01 |
| Project Name | Support for new capacities for production and storage of electricity from renewable energy in the company "PIRIN - TEX" LLC |
| Beneficiary | 811131069 PIRIN-TEX LTD |
| Funding | RRF ==> Recovery and Resilience Plan |
| Date of the Contract/Order | 09.07.2025 |
| Start Date | 09.07.2025 |
| End Date | 31.03.2026 |
| Status of Implementation of the Contract/Order of the Grant | In execution (starting date) |
| Location of Performance |
|
| Brief description |
"ПИРИН - ТЕКС" ЕООД се занимава с производство на облекла от 1993 година. Стремежа на фирмата е постоянно да развива своята производствена дейност. За постигането на своите цели дружеството се нуждае от въвеждане на нови екологични и иновативни подходи. Интегрирането на възобновяема енергия с локални съоръжения за съхранение (батерии), значително повишава икономическите ползи от възобновяемата енергия. Именно чрез изграждане на централа за производство и съхранение на енергия от възобновяеми източници ще се подобри стабилността и сигурността на електрическата мрежа. И по-конкретно, батериите ще съхраняват излишната енергия, генерирана от възобновяемите източници по време на периоди на ниско търсене и ще я освобождават при голямо търсене или когато генерирането е ниско (напр. през нощта за слънчева енергия). Това спомага за стабилизиране на мрежата, намалява нуждата от пикови електроцентрали и гарантира надеждно захранване. Това подсигурява и балансиране на натоварването на мрежата. Включването и изграждането на батерии към централата за ВИ помага за балансиране на предлагането и търсенето, намалявайки риска от спиране на тока и подобрявайки цялостната ефективност на енергийната система. Именно в тази насока се е насочило и нашето дружество - изграждане на централа и локални съоръжения за съхранение (батерии). Към момента дружеството има изградена фотоволтаична електроцентрала, към която ще проектира локални съоръжения за съхранение (батерии). Проектното предложение на "ПИРИН - ТЕКС" ЕООД със следните мощности: - 425 kW изградена фотоволтаична електроцентрала - 200 kW за изграждане локални съоръжение за съхранение, обект на инвестицията. Дейностите заложени в предложението за инвестиции от краен получател са съобразени с изискванията на принципа за „ненанасяне на значителни вреди“ върху околната среда, допринасяйки за екологичния преход на страната и предприятието в частност. |
| Activities |
|
| Partners | None |
| Contractors |
|
| Subcontractors | None |
| Members of the Consortium | None |
|
Notes: * The projected contract value may be lower than the reported one because of any of the following reasons:
** This column represents the amount of costs claimed by the beneficiary |
|
| Indicator 1 | Installed and put into operation new capacities for electricity storage, Measure Unit: MW, Base Value: 0.00 , Target amount: 0.20 , Reached amount: 0.00 |
| Indicator 2 | Capacity of the installed storage, Measure Unit: MWh, Base Value: 0.00 , Target amount: 0.40 , Reached amount: 0.00 |
| Indicator 3 | Installed and put into operation new capacities for the production of electricity from renewable energy (wind and/or solar energy), Measure Unit: MW, Base Value: 0.00 , Target amount: 0.42 , Reached amount: 0.00 |
| Total Project cost | 169 227.28 EUR |
| Grant | 84 613.64 EUR |
| Self amount | 84 613.64 EUR |
| Total actual amounts paid | 0.00 EUR |
| Percentage of EU co-financing | 100.00 % |
| None | |
|
Notes: 1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower. 2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment. |
|
| Procedure 1 |
Subject to due process: Избор на изпълнител за доставка, изграждане и въвеждане в експлоатация на локални съоръжения за съхранение на енергия от възобновяеми източници (батерии), във връзка с изпълнението на одобрена инвестиция по проектно предложение № BG-RRP-4.032-0229 по процедура чрез подбор от крайни получатели BG-RRP-4.032 „Подкрепа за нови мощности за производство на електроенергия от възобновяеми източници и съхранение на електроенергия с инсталирана мощност от 200 kW до 2 MW” (Покана 1) от Националния план за възстановяване и устойчивост.,
Estimated Amount: 164 523.40
|
| Procedure 2 |
Subject to due process: Избор на изпълнител за изготвяне на технически инвестиционен проект по част „Електро“ за обект: „Инсталиране на локално съоръжение за съхранение на електрическа енергия (ЛССЕЕ) към съществуваща фотоволтаична електроцентрала“, във връзка с изпълнението на одобрена инвестиция № BG-RRP-4.032-0229 по процедура BG-RRP-4.032 „Подкрепа за нови мощности за производство на електроенергия от възобновяеми източници и съхранение на електроенергия с инсталирана мощност от 200 kW до 2 MW“ (Покана 1) от Националния план за възстановяване и устойчивост.,
Estimated Amount: 3 936.95
|
| Procedure 3 |
Subject to due process: Избор на изпълнител за ръководство, контрол и отговорност по техническото изпълнение на дейностите по доставка, изграждане и въвеждане в експлоатация на локални съоръжения за съхранение на енергия (ЛССЕЕ), във връзка с изпълнението на одобрена инвестиция по процедура чрез подбор от крайни получатели BG-RRP-4.032 „Подкрепа за нови мощности за производство на електроенергия от възобновяеми източници и съхранение на електроенергия с инсталирана мощност от 200 kW до 2 MW” от Националния план за възстановяване и устойчивост.,
Estimated Amount: 766.94
|
Notes: