| UMIS Number | BG-RRP-4.033-0031-C02 |
| Project Name | Construction of new capacities for production of electricity from renewable sources with a nominal AC power of 37.2 MW and electricity storage with a power of 18.04 MW and a useful capacity of 37 MWh |
| Beneficiary | 206852115 United Group Solar BG EOOD |
| Funding | RRF ==> Recovery and Resilience Plan |
| Date of the Contract/Order | 13.03.2025 |
| Start Date | 13.03.2025 |
| End Date | 30.06.2026 |
| Status of Implementation of the Contract/Order of the Grant | In execution (starting date) |
| Location of Performance |
|
| Brief description |
Настоящото проектно предложение е насочено към изграждане на локални съоръжения за съхранение на електрическа енергия (ЛСС) като компонент от комбиниран проект за нови инсталирани мощности за производство на електрическа енергия от възобновяеми източници. ЛСС по предложението за инвестиции представлява компонент от Фотоволтаична централа с обща инсталирана променливотокова АС мощност 37200 kW /37.2 МW/, като ЛСС ще бъде с инсталирана мощност 18040 kW /18.04МW/ и полезен капацитет 37000 kWh /37.0 МWh/. Към датата на кандидатстване с предложението за инвестиция работите по проекта за двата компонента (производство и съхранение) не са започнали. За изграждане на планираната ФЕЦ е сключен предварителен договор за присъединяване на обект към преносната електрическа мрежа с Електроенергиен системен оператор ЕАД № ПРД-ПР-110-1802/24.08.2023 г., за инсталирана мощност на обекта 40 MW. Комбинираният проект ще бъде изграден в УПИ № 17645.325.1, м. Краище, кв.325, гр. Грамада, област Видин. За проекта е издадено Решение на РИОСВ - Монтана № МО 30-ЕО/2022 г. за преценяване на необходимостта от извършване на екологична оценка. За изграждане на ЛСС като компонент от комбинирания проект е изготвен идеен проект, в който са описани техническите параметри на ЛСС като компонент на комбинирания проект. Предложението за инвестиции включва дейности и разходи, необходими и пряко свързани с изгражданото ЛСС като компонент от комбиниран проект за нови инсталирани мощности за производство на електрическа енергия от слънчева и/или вятърна енергия и за ЛСС. |
| Activities |
|
| Partners | None |
| Contractors |
|
| Subcontractors | None |
| Members of the Consortium | None |
|
Notes: * The projected contract value may be lower than the reported one because of any of the following reasons:
** This column represents the amount of costs claimed by the beneficiary |
|
| Indicator 1 | Installed and commissioned part of new renewable electricity generation capacity (in case applying for only part of the planned new renewable electricity generation capacity), Measure Unit: MW, Base Value: 0.00 , Target amount: 0.00 , Reached amount: 0.00 |
| Indicator 2 | Capacity of the installed storage, Measure Unit: MWh, Base Value: 0.00 , Target amount: 37.00 , Reached amount: 0.00 |
| Indicator 3 | Installed and put into operation new capacities for the production of electricity from renewable energy (wind and/or solar energy), Measure Unit: MW, Base Value: 0.00 , Target amount: 37.20 , Reached amount: 0.00 |
| Indicator 4 | Installed and put into operation new capacities for electricity storage, Measure Unit: MW, Base Value: 0.00 , Target amount: 18.04 , Reached amount: 0.00 |
| Total Project cost | 7 769 999.95 EUR |
| Grant | 3 496 499.98 EUR |
| Self amount | 4 273 499.97 EUR |
| Total actual amounts paid | 0.00 EUR |
| Percentage of EU co-financing | 100.00 % |
| None | |
|
Notes: 1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower. 2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment. |
|
| Procedure 1 |
Subject to due process: Доставка и монтаж на ЛСС,
Estimated Amount: 15 122 844.90
|
| Procedure 2 |
Subject to due process: Строителен надзор ЛССЕЕ Грамада_18.04 MW,
Estimated Amount: 10 000.00
|
| Procedure 3 |
Subject to due process: Технически консултант на : Локално съоръжение за съхранение на електрическа енергия (ЛССЕЕ „Грамада“) с инсталирана мощност 18.04 MW към ФЕЦ „Грамада“
,
Estimated Amount: 58 059.10
|
Notes:
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN