| UMIS Number | BG-RRP-4.033-0036-C02 |
| Project Name | Development of combined project "St. George” for new capacities for production of electricity from PV sources with total installed power of 199MW and storage of electricity with total installed power of 90 MW together with installed local storage capacity of 239.78 MWh located in the municipality of Silistra |
| Beneficiary | 115859531 R-Engineering EOOD |
| Funding | RRF ==> Recovery and Resilience Plan |
| Date of the Contract/Order | 17.03.2025 |
| Start Date | 17.03.2025 |
| End Date | 30.06.2026 |
| Status of Implementation of the Contract/Order of the Grant | In execution (starting date) |
| Location of Performance |
|
| Brief description |
Настоящият комбиниран проект цели да предостави надеждни и устойчиви енергийни решения чрез интегриране на локални съоръжения за съхранение на електрическа енергия (ЛСС) 90MW/239.78MWh с нова 199 MW AC слънчева електроцентрала „Свети Георги“ в община Силистра. Производството на слънчева енергия е непостоянно и изисква ефективно съхранение на енергията. ЛСС по проекта ще се захранват с повече от 75% от електроенергията от соларната централа, а останалата част ще се доставя от мрежата. По този начин ще се постигне стабилност и предвидимост на доставките на електричество. Целевите групи включват местни общности, доставчици на енергия, административни и регулаторни органи и защитници на околната среда. Гражданите и бизнеса в региона ще се възползват от по-надеждно и устойчиво снабдяване със зелена енергия. Компаниите за комунални услуги и енергоразпределителните дружества ще имат предвидими и стабилни енергийни доставки. Органите, отговорни за енергийната политика и екологичните разпоредби, ще отчетат напредък в постигането на целите за ВЕИ и подобряване на работата на мрежата. Организациите, насърчаващи устойчивото развитие, ще възприемат проекта като значителна стъпка към намаляване на вредните газове. Основните цели са да се повиши енергийната сигурност, да се намали въздействието върху околната среда и да се насърчи използването на ВЕИ. Интегрирането на ФЕЦ с решения за съхранение на енергия ще осигури непрекъснато електроснабдяване, ще подобри стабилността на мрежата и ще намали вредните емисии, в подкрепа на устойчивите енергийни политики на България. Очакваните резултати включват още намален риск от прекъсване на електрозахранването, намален въглероден отпечатък и икономически ползи от по-ниските разходи за енергия и намалената зависимост от изкопаеми горива. Основните дейности включват проектиране, закупуване, доставка и инсталиране на необходимото оборудване за ЛСС, стриктно тестване преди въвеждане в експлоатация и провеждане на мониторинг и поддръжка. |
| Activities |
|
| Partners | None |
| Contractors |
|
| Subcontractors | None |
| Members of the Consortium | None |
|
Notes: * The projected contract value may be lower than the reported one because of any of the following reasons:
** This column represents the amount of costs claimed by the beneficiary |
|
| Indicator 1 | Installed and commissioned part of new renewable electricity generation capacity (in case applying for only part of the planned new renewable electricity generation capacity), Measure Unit: MW, Base Value: 0.00 , Target amount: 0.00 , Reached amount: 0.00 |
| Indicator 2 | Capacity of the installed storage, Measure Unit: MWh, Base Value: 0.00 , Target amount: 239.78 , Reached amount: 0.00 |
| Indicator 3 | Installed and put into operation new capacities for the production of electricity from renewable energy (wind and/or solar energy), Measure Unit: MW, Base Value: 0.00 , Target amount: 199.00 , Reached amount: 0.00 |
| Indicator 4 | Installed and put into operation new capacities for electricity storage, Measure Unit: MW, Base Value: 0.00 , Target amount: 90.00 , Reached amount: 0.00 |
| Total Project cost | 37 920 000.72 EUR |
| Grant | 18 960 000.36 EUR |
| Self amount | 18 960 000.36 EUR |
| Total actual amounts paid | 0.00 EUR |
| Percentage of EU co-financing | 100.00 % |
| None | |
|
Notes: 1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower. 2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment. |
|
| Procedure 1 |
Subject to due process: Възлагане изпълненине на СМР за ЛСС,
Estimated Amount: 6 845 405.00
|
| Procedure 2 |
Subject to due process: Възлагане на дейности за проектиране на ЛСС,
Estimated Amount: 100 000.00
|
| Procedure 3 |
Subject to due process: Възлагане на дейности по доставка на ЛСС,
Estimated Amount: 65 979 925.00
|
Notes:
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN