| UMIS Number | BG-RRP-4.033-0039-C01 |
| Project Name | Construction of a new facility combining a 39.95 MW photovoltaic power plant ("PV Plant") in combination with a 19.5 MW Local Energy Storage Facility ("LESF") with a power capacity of 44.72 MWh on properties 47843.29.385; 47843.31.362; 47843.31.373; 47843.123.364; 47843.18.177; 47843.20.864; and 47843.15.132 in the Town of Merichleri, municipality. Dimitrovgrad |
| Beneficiary | 205824198 Angus Bulgaria Ltd |
| Funding | RRF ==> Recovery and Resilience Plan |
| Date of the Contract/Order | 05.03.2025 |
| Start Date | 05.03.2025 |
| End Date | 31.03.2026 |
| Status of Implementation of the Contract/Order of the Grant | In execution (starting date) |
| Location of Performance |
|
| Brief description |
Настоящото проектно предложение е за получаване на безвъзмездна помощ за разходите за доставка и монтаж на Локални Съоръжения за Съхранение (ЛСС) на електрическа енергия с капацитет 44.72 MWh и 19.5 MW инсталирана мощност, част от комбиниран проект с фотоволтаична система с номинална променливотокова (AC) мощност 39.95 MW. На 10.10.2023 г. е подписан предварителен договор за присъединяване на обекта за производство на електрическа енергия към електроразпределителната мрежа на "Електроенергиен системен оператор" ЕАД. Към настоящия момент не е стартирало строителството на комбинирания проект - нито на фотоволтаичната система, нито на ЛСС. Комбинираният проект ще се изпълни в имоти 47843.29.385; 47843.31.362; 47843.31.373; 47843.123.364; 47843.18.177; 47843.20.864 И 47843.15.132 гр. Меричлери, общ. Димитровград. Дейностите по изпълнение на комбинирания проект ще се извърши от лица, притежаващи необходимия опит за извършването на тази дейност. Техническият ръководител на проекта има опит в изпълнението на редица проекти за изграждане на ФЕЦ, включително такива с мощности над 20 MW, присъединени към мрежи високо напрежение. |
| Activities |
|
| Partners | None |
| Contractors |
|
| Subcontractors | None |
| Members of the Consortium | None |
|
Notes: * The projected contract value may be lower than the reported one because of any of the following reasons:
** This column represents the amount of costs claimed by the beneficiary |
|
| Indicator 1 | Installed and commissioned part of new renewable electricity generation capacity (in case applying for only part of the planned new renewable electricity generation capacity), Measure Unit: MW, Base Value: 0.00 , Target amount: 0.00 , Reached amount: 0.00 |
| Indicator 2 | Capacity of the installed storage, Measure Unit: MWh, Base Value: 0.00 , Target amount: 44.72 , Reached amount: 0.00 |
| Indicator 3 | Installed and put into operation new capacities for the production of electricity from renewable energy (wind and/or solar energy), Measure Unit: MW, Base Value: 0.00 , Target amount: 39.95 , Reached amount: 0.00 |
| Indicator 4 | Installed and put into operation new capacities for electricity storage, Measure Unit: MW, Base Value: 0.00 , Target amount: 19.50 , Reached amount: 0.00 |
| Total Project cost | 8 088 739.82 EUR |
| Grant | 4 044 369.91 EUR |
| Self amount | 4 044 369.91 EUR |
| Total actual amounts paid | 0.00 EUR |
| Percentage of EU co-financing | 100.00 % |
| None | |
|
Notes: 1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower. 2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment. |
|
| Procedure 1 |
Subject to due process: Доставка и монтаж на ЛСС с капацитет 44.72 MWh и мощност 19.5 MW.,
Estimated Amount: 8 088 739.82
|
Notes:
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN