BG-RRP-4.032-0185-C01
Construction of a local energy storage system with an installed capacity of 1980 kW to a photovoltaic power plant owned „CPK ARO“ EOOD with an installed capacity of 4600 kW built, in the process of commissioning.
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
14.03.2025
14.03.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North-West (BG31), Pleven (BG314), Dolna Mitropolia, Trastenik
