BG-RRP-4.034-0116-C02
Separate electricity storage facility with installed power of 150 MW and storage capacity of 600 MWh (of them for financing under procedure BG-RRP-4.034 "National infrastructure for storage of electricity from renewable sources" installed power of 125 MW and storage capacity of 500 MWh) in the city of Burgas, locality Golyamata niva, property with identifier №07079.13.902
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
29.08.2025
29.08.2025
30.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Burgas (BG341), Burgas, Burgas
