BG-RRP-4.034-0069-C02
Construction of a local energy storage system using batteries with a total installed capacity of 50 MW and a capacity of 100 MWh at the site of "Toplofikatsia-Pernik" AD
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
12.01.2026
12.01.2026
30.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South-West (BG41), Pernik (BG414), Pernik, Pernik
