BG-RRP-4.032-0147-C01
Delivery and installation of a Local Electric Energy Storage System with a capacity of 4MWh, part of a combined project for the production of electricity from renewable energy sources with an installed nominal AC power of 5.1 MW.
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
07.01.2025
07.01.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South Central (BG42), Plovdiv (BG421), Asenovgrad, Asenovgrad
