BG-RRP-4.034-0137-C02
Project for construction of stand-alone Battery Energy Storage System (BESS) with rated power capacity of 10MW with direct optic connection to the telecommunication network of ESO EAD located on a LP 67338.835.79 on the territory of Sliven city.
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
29.10.2025
29.10.2025
30.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Sliven (BG342), Sliven, Sliven
