BG-RRP-4.032-0200-C01
Combined project for the construction of a local energy storage system with a power of 0.6 MW and a capacity of 1.29 MWh to connect to the newly built FEC Gramina with a design installed capacity of 1.2 MW".
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
19.02.2025
19.02.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North Central (BG32), Veliko Tarnovo (BG321), Svishtov, Morava