BG-RRP-4.032-0007-C01
Combined project for construction of a co-located Battery Energy Storage System (BESS) with rated power capacity of 800 kW and minimum energy capacity of 2000 kWh, together with a new power generating capacity from PvPP with a nominal AC generating capacity of 1700 kW, situated in LP with identification No. 68117.6.1, "Kalni Kavak" area, village of Sotiria, Sliven municipality.
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
12.03.2025
12.03.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Sliven (BG342), Sliven, Sotirya
