BG-RRP-4.032-0133-C01
Combined project for construction of a co-located Battery Energy Storage System (BESS) with rated power capacity of 1MW and minimum energy capacity of 2.032 MWh, togather with a new capacity for production of electrical energy from PvPP with a nominal (AC) generating capacity of 2.493 MW, located in LP 62596.52.613, Riben village, Dolna Mitropolia Municipality, Pleven region.
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
14.02.2025
14.02.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North-West (BG31), Pleven (BG314), Dolna Mitropolia, Riben
