BG-RRP-4.033-0051-C02
Combined project for construction of co-located Battery Energy Storage System (BESS) with rated power capacity of 40MW and minimum energy capacity of 80 MWh together with new built Photovoltaic Power Plant (PvPP) for the production of el. energy with a nominal (AC) generating capacity of 80MW situated in LP-77030.36.285,77030.24.924,77030.32.654,77030.24.925,77030.36.648 in v.Hadzhidimitrovo
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
11.02.2025
11.02.2025
30.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Yambol (BG343), Tundzha, Hadzhidimitrovo