BG-RRP-4.032-0090-C02
Construction of a new installation combining a photovoltaic power plant (PEC) with a nominal alternating current power of 4,400 kW (direct current power 4,891.82 kWp) and a local storage facility (BESS) of electrical energy with nominal power of 1,800 kW and a capacity of 3,600 kWh
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
21.02.2025
21.02.2025
30.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Yambol (BG343), Tundzha, Malomir
