BG-RRP-4.032-0100-C02
Construction of new capacities for the production of electricity from renewable sources with an AC power of 5MW and an ELS for electricity storage with power of 1.53 MW and a capacity of 3.06 MWh in PI 53833.6.234
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
28.02.2025
28.02.2025
30.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South Central (BG42), Plovdiv (BG421), Rodopi, Orizari
