BG-RRP-4.033-0059-C02
Construction of a local energy storage system with a capacity of 26,832 MW to a new capacity for energy production of renewable source with installed capacity of 86,215 MW
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
02.01.2025
02.01.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North-West (BG31), Lovech (BG315), Lovech, Lovech
