BG-RRP-4.032-0137-C01
Construction of a 400 KW Battery Energy Storage System (BSS) for a 1 MW Photovoltaic Power Plant
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
20.03.2025
20.03.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North Central (BG32), Razgrad (BG324), Loznitsa, Loznitsa
