BG-RRP-4.034-0131-C02
Construction of a Battery Energy Storage System (BESS) on the territory of TPP Bobov Dol
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
29.10.2025
29.10.2025
30.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South-West (BG41), Kyustendil (BG415), Bobovdol, Golemo Selo
