BG-RRP-4.032-0253-C01
Construction of a new installation combining a photovoltaic power plant (PEC) with a nominal alternating current power of 4 960 kW and a local electric energy storage facility (BESS) with a power of 2 000 kW and a capacity of 4 368 kW
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
13.03.2025
13.03.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North-West (BG31), Pleven (BG314), Levski, Levski
