BG-RRP-4.034-0078-C01
Project for construction of stand-alone Battery Energy Storage System (BESS) with rated power capacity of 10.35MW with direct optic connection to the telecommunication network of ESO EAD located on a LP 59080.42.529 on the territory of Parvomay city
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
28.08.2025
28.08.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South Central (BG42), Plovdiv (BG421), Parvomay, Parvomay
